Skip to content
English (United Kingdom)Svenska (Sverige)

3000 W bench or rack lab power supply PSU SM3000

Print E-mail
sm3000
  • Compact  3000W as 19” or bench power supply.
  • Very low voltage and current ripple.
  • Very stable voltage or current 5.10-5 - 10.10-5
  • Accurate voltage and current adjustment with10-turn potentiometers, optionally digital encoders
  • Programmable via analog signal, optional built-in Ethernet, RS232or IEEE488 interface boards.
  • Protected against all overload and short circuit conditions
  • Temperature regulated fan - silent cooling.
  • Meets CE-demand on both laboratory and industrial environments
  • High Speed Programming versions available for ATE, Laser Diodes
  • Power Sink Option: 2 Quadrant operation for PWM motor testing or fast down programming in ATE systems
  • "Power Sink" are available as options on SM15-200, SM30-100, SM45-70, SM70-45. The "power sink" is an active load that absorbs part of the kick-back energy when a inductive load like a motor is braking or you want to make a fast down load in ATE systems.
Download datasheets on
SM3000-series
SM3000-series ”Fast regulation”
Power Sink
Unit Output voltage
Output current Input Weight
SM15-200D 0 - 15 V 0 - 200 A 342 - 457 Va.c.
3 phase Y
15 kg
SM30-100D 0 - 30 V 0 - 100 A 342 - 457 Va.c.
3 phase Y
15 kg
SM45-70D - P087 0 - 40 V

0 - 80 A

342 - 457 Va.c.
3 phase Y
15 kg
SM45-70D 0 - 45 V 0 - 70 A 342 - 457 Va.c.
3 phase Y
15 kg
SM70-45D 0 - 70 V 0 - 45 A 342 - 457 Va.c.
3 phase Y

15 kg

SM120-25D 0 - 120 V 0 - 25 A 342 - 457 Va.c.
3 phase Y
15 kg
SM300-10D 0 - 300 V

0 - 10 A

342 - 457 Va.c.
3 phase Y
15 kg

Open the option list:
Master-slave adapter for series connection
Built-in RS232 interface GPIB interface
Built-in Ethernet interface
Built-in 4 chanel isolation amplifier
Faster regulation
Series diode for battery charging.

Last Updated on Saturday, 06 August 2011 15:59
 
Banner
Banner

Newsletter




Besökare

Idag8
Igår145
Denna vecka328
Månad940
Alla37876

Newsflash

Our Åtvidaberg plant is expanded and refurbished we also a new entrace. The reason is increased demand of our DC/DC converters and that the production of the Systems division products has also been moved to the plant. In connection with the expansion we also changed the energy system and are using heat pumps charged by the Swedish Granite ground.